OGV Group Podcasts

The case for fast-tracking Berwick Bank

October 24, 2022 Kenny Dooley Season 1 Episode 5
The case for fast-tracking Berwick Bank
OGV Group Podcasts
More Info
OGV Group Podcasts
The case for fast-tracking Berwick Bank
Oct 24, 2022 Season 1 Episode 5
Kenny Dooley

OGV Renewables Magazine speaks exclusively to the Project Director of SSE Renewables, Alex Meredith, about the case for fast-tracking the Berwick Bank project. Located in the Firth of Forth, the project, if sanctioned, will become the biggest offshore wind project in the UK and deliver up to 4.1 GW of electricity, which is enough to power circa 5 million homes and create circa 10,000 domestic jobs.



Show Notes

OGV Renewables Magazine speaks exclusively to the Project Director of SSE Renewables, Alex Meredith, about the case for fast-tracking the Berwick Bank project. Located in the Firth of Forth, the project, if sanctioned, will become the biggest offshore wind project in the UK and deliver up to 4.1 GW of electricity, which is enough to power circa 5 million homes and create circa 10,000 domestic jobs.